Royal Oak Fringe

Macpherson Walk East

MacPherson Walk East is the first phase of Hungerford's Royal Oak-area urban village, completed in 2009 across five Irmin Street addresses. Its paired courtyard buildings use charcoal brick, taupe siding, gabled window bays and timber-bracketed eaves, with paths and gardens softening the four-storey scale. The 165-home BCS3540 strata is distinct from MacPherson Walk West and North, so buyers should review East-phase documents specifically.

architectural promotional rendering of MacPherson Walk East's paired four-storey buildings and broad brick-paver arrival court

Building snapshot

Address
5881 Irmin Street
Completion year
2009
Developer
Hungerford Properties
Builder
Unknown / Needs Verification
Building type
Multi-building condominium and townhouse phase up to four storeys
Height
4 storeys
Unit count
165
Construction
Full-rainscreen wood-frame low-rise construction on concrete perimeter foundations with mixed siding, brick and asphalt-shingle roofs
Tenure
Freehold strata (BCS3540)
Near station
Royal Oak / district transit context
Parking
Secured underground parking with visitor parking; verify assigned stalls by strata lot
Storage
Storage lockers are reported with individual homes; verify allocation and title from current strata documents
Micro-location
Royal Oak Fringe

What this building is known for

The 2009 East phase pairs West Coast low-rise architecture with a broad arrival court, landscaped paths, clubhouse amenities and convenient Royal Oak access.

Buyer due-diligence checklist

Use these building-specific prompts to structure your document review and professional inspections. They identify questions to investigate, not conclusions about condition.

Construction and major systems

Review the current depreciation report and strata minutes for the building envelope, roof, balconies, drainage, insurance and acoustic concerns. Confirm which components are common property and whether major work is planned.

Age and capital planning

For a 2009 building, compare the original component life cycles with work already completed and the projects identified in the current depreciation report. Check whether contingency funding aligns with those plans.

Parking, storage and ownership details

The profile identifies the tenure as Freehold strata (BCS3540). General parking information is available, but the legal stall designation, use rights and any allocation to a specific home must be confirmed. General storage information is available, but the locker designation and use rights must be confirmed.

Location and future change

Macpherson Walk East is grouped within Royal Oak Fringe, with the broader Metrotown and Royal Oak transit network providing the relevant transit context. Test the actual walking route at the times you expect to travel, and review nearby active or proposed development for potential changes to noise, access, outlook and construction activity.

Explore this part of Metrotown

Royal Oak & Southwest Metrotown

Lower-density than the Metrotown core, with a broad selection of wood-frame, townhouse and mid-rise communities near Royal Oak.

Royal Oak Station guide

Similar and nearby buildings

Continue with buildings that share this area, station context, building type or a similar completion period.

Common buyer questions

What type of building is Macpherson Walk East?

Macpherson Walk East is profiled as completed in 2009, 4 storeys, 165 strata homes or lots, multi-building condominium and townhouse phase up to four storeys, full-rainscreen wood-frame low-rise construction on concrete perimeter foundations with mixed siding, brick and asphalt-shingle roofs. Confirm these details against current strata, title and property records before relying on them.

What should buyers review before purchasing at Macpherson Walk East?

Review the current depreciation report and strata minutes for the building envelope, roof, balconies, drainage, insurance and acoustic concerns. Confirm which components are common property and whether major work is planned. For a 2009 building, compare the original component life cycles with work already completed and the projects identified in the current depreciation report. Check whether contingency funding aligns with those plans.

Are parking and storage confirmed at Macpherson Walk East?

The profile identifies the tenure as Freehold strata (BCS3540). General parking information is available, but the legal stall designation, use rights and any allocation to a specific home must be confirmed. General storage information is available, but the locker designation and use rights must be confirmed.

Where is Macpherson Walk East within Metrotown?

Macpherson Walk East is grouped within Royal Oak Fringe, with the broader Metrotown and Royal Oak transit network providing the relevant transit context. Test the actual walking route at the times you expect to travel, and review nearby active or proposed development for potential changes to noise, access, outlook and construction activity.